North-Link Stage 2

North-Link Stage 2

Client – Great Northern Connect

Design, supply, install and test Screw Piling for Great Northern Connect – North-Link Stage 2.  Aspects included:

  • 6 number Screw Piles for FB9425 Pedestrian Footbridge.
  •  2 Screw Piles for FB9426 Pedestrian Footbridge
  • 16 number Screw Piles for FB9122A Pedestrian Footbridge