North-Link Stage 2

Pilewest - Screw Piling at Great Northern Connect – North-Link Stage 2. Image.

Client – Great Northern Connect

Design, supply, install and test Screw Piling for Great Northern Connect – North-Link Stage 2.  Aspects included:

  • 6 number Screw Piles for FB9425 Pedestrian Footbridge.
  •  2 Screw Piles for FB9426 Pedestrian Footbridge
  • 16 number Screw Piles for FB9122A Pedestrian Footbridge

85 Grey Street Northam

Pilewest - Screw pile installation at 85 Grey St, Northam. Image.

Client – Firm Construction

Design, supply and install 36 Screw Piles at 85 Grey Street, Northam.

BHP Mulla Mulla Camp Extension

Pilewest - Screw Pile Testing at BHP Mulla Mulla Camp. Image.

Client – Tetra Tech

Screw Pile testing at BHP Mulla Mulla Camp Extension.

Macedon Construction Camp

Pilewest Macedon Construction Camp Project

Location  – Onslow, Western Australia
Project Owner – BHP Billiton
ECPM – Technip
Client – OTOC Australia
Date – August 2011

Pilewest designed, supplied, installed and tested screwpiles foundations for the new 350-man new construction camp for the Macedon Gas Project, including, kitchen refuge and associated service buildings.

Pilewest undertook additional geotechnical investigation across the site to determine the existing ground conditions to enable an optimum screwpile design. Design of a new bolted adjustable top fixing bracket enabled fast and easy installation.