“Thank you for the work your staff undertook on the FMG Solomon Spur project. Your product was excellent and you installation exceeded my expectation plus your staff had an excellent work and safety ethic and would have no hesitation in recommending Pilewest .”

Eddy Gaidzionis
Project Manager,
UGL Infrastructure

UGL LOGO

“Pilewest have worked with ATCO Structures and Logistics in a currently successful execution of the Wheatstone Project, Jobsite Modular Buildings Contract. At all times have they proved to be helpful in design and construction as well as passing on site experiences and contacts as they had already established on site. 

The level of documentation and verification for this particular site is one of the most stringent I have faced. Pilewest have proven to be more than capable of delivering what was required of them.”

Andrew Rijken
Engineering Manager
ATCO Structures & Logistics Pty Ltd

ATCO LOGO

Pilewest was the contractor chosen by Decmil for the design and installation of screwpiles for Chevron’s Wheatstone 1056 person Fly Camp near Onslow, including central facilities and infrastructure buildings.

During my time as the overseeing Senior Project Engineer for Pilewest I found their quality of work, meeting set schedules, and provision of requested documentation to be of the highest standard. Safety was always first on their agenda and they always listened to our needs as the client, understanding the common goals and demonstrating this through their actions.

Pilewest’s upper management also showed high levels of interpersonal, leadership and communication skills whenever they visited site or during meetings in Perth. I would have no hesitation in engaging with Pilewest again in future projects due to their professionalism, quality of work and willingness to always assist when requested.”

 John Reilly
Senior Project Engineer –
Wheatstone Project

Decmil Australia

Decmil Logo

Pilewest provided us with a total solution for a footing and tie down system to allow installation of our modular buildings at the Chevron owned Wheatstone LNG project in Onslow, Western Australia. The solution included engineering design, supply, install and testing. Pilewest carried out their works in a professional manner and finished on time meeting all of our expectations.”

Jonathan Wilson
Construction Manager
Ausco Modular Pty Limited

AUSCO LOGO

“Pilewest have provided invaluable design and technical support to us over many projects throughout many remote sites in WA.

I have found their service to exceptionally proficient technically and the follow through on the ground in relation to HSE and Quality has exceeded our expectations. Because foundation works is invariably a key driver of project delivery on program, we have worked to very tight deadlines and timeframes, Pilewest has never failed to complete and hand over a stage on time. I have found their site staff to be professional and follow up documentation and close out to be more than satisfactory.”

Terry O’Driscoll
Bid Manager
OTOC Australia

Aqura Technologies Logo
OTOC LOGO